A rod lift well, in Piedmont, OK, was battling persistent gas interference due to low fluid
levels, causing inefficient pumping cycles, reduced oil sales, and increasing downtime.
High casing pressure choked production.

Solution
Titan Flex unit Installed at the Wellhead
7C installed the Titan Flex compressor at the casing head to draw down pressure. This relieved bottomhole pressure, reduced gas lock, and allowed the pump to move fluid more consistently, without overcycling or early shutdowns.
Performance Results Over a 60-Day Period


Results
Less Downtime. More Production.Clear Value.
The installation of Titan Flex resulted in a: 175% increase in gathered oil, 86% reduction in casing pressure, 100% pump fillage, and a $28,500 increase in monthly cashflow.
Bottom Line